Earthworks Contractors - Packages for your Residential and Rural Sites

Residential

Average Residential Site up to 400m2’

Transport of Excavator from yard to site and back to yard once completed
$ 575.00
Excavator Hire up to 5 days
$ 5980.00
Removal of soils including tipping fees and transport up to 5 loads
$ 1810.00
Gap 65 up to 3 loads at an average of 14 tonne per load
$ 2075.00
Gap 7 up to 2 loads at an average of 14 tonne per load to cover excavated site as per engineers instruction
$ 1575.00

Total Cost

$ 12015.00

Average Residential Site up to 700m2

Transport of Excavator from yard to site and back to yard once completed
$ 575.00
Excavator Hire up to 6 days
$ 7180.00
Removal of soils including tipping fees and transport up to 6 loads
$ 2170.00
Gap 65 up to 6 loads at an average of 14 tonne per load
$ 4150.00
Gap 7 up to 3 loads at an average of 14 tonne per load to cover excavated site as per engineers instruction
$ 2360.00

Total Cost

$ 16435.00

Rural

Average Rural Site up to 2000m2

Transport of Excavator from yard to site and back to yard once completed
$ 575.00
Excavator Hire up to 8 days
$ 9570.00
Removal of soils including tipping fees and transport up to 12 loads
$ 4335.00
Gap 65 up to 10 loads at an average of 14 tonne per load
$ 6915.00
Gap 7 up to 3 loads at an average of 14 tonne per load to cover excavated site as per engineers instruction
$ 2360.00

Total Cost

$ 23755.00

Average Rural Site up to 4000m2’

Transport of Excavator from yard to site and back to yard once completed
$ 575.00
Excavator Hire up to 12 days
$ 14355.00
Removal of soils including tipping fees and transport up to 14 loads
$ 5060.00
Gap 65 up to 14 loads at an average of 14 tonne per load
$ 9880.00
Gap 7 up to 3 loads at an average of 14 tonne per load to cover excavated site as per engineers instruction
$ 2360.00

Total Cost

$ 32320.00

Average Rural Site up to 6000m2

Transport of Excavator from yard to site and back to yard once completed
$ 575.00
Excavator Hire up to 15 days
$ 17940.00
Removal of soils including tipping fees and transport up to 16 loads
$ 5780.00
Gap 65 up to 15 loads at an average of 16 tonne per load
$ 10370.00
Gap 7 up to 3 loads at an average of 14 tonne per load to cover excavated site as per engineers instruction
$ 2360.00

Total Cost

$ 37025.00

Due to the nature of different sites and the need for Topo and Geo reports to be completed, the prices shown are a prime cost (PC) sum. PC sum means we have made an allowance in our pricing and the actual price is to be substituted for the allowance once the topo and geo reports have been completed. The final price might go up or down slightly once the necessary details have been considered.